Blog

——

2025/08/29

Xi'an Qigong Electric | New factory officially put into operation, ushering in a new era of efficiency!

The new factory has officially started production, ushering in a new era of efficiency!

View Details

Xi'an Qigong Electric | Warmly welcomes international electrical engineering students to visit!

Warmly welcome international electrical engineering students to visit!

25

2025/06

Xi'an Qigong Electric | Successful commissioning of the high-voltage soft starter at a certain sluice station of the Laian County Jiangshui Diversion Project!

The high-pressure soft-start commissioning of a certain gate station in the Jiangshuibediao Project in Lai'an County was successful!

28

2025/03

Xi'an Qigong Electric | Successful commissioning of high-voltage soft starter for a drainage pumping station project in a Changsha urban area!

High-voltage soft start successfully debugged for a drainage pumping station project in Changsha city area!

19

2025/03

Xi'an Qigong Electric Power | The 2025 Annual Meeting Ceremony Concludes Successfully!

The Xi'an Qigong Electric 2025 Annual Conference Ceremony concludes successfully!

20

2025/02

Xi’an Cheegon Electric Co., Ltd. | The high voltage soft start of sintering machine upgrading project of an iron and steel group in Gansu province was successfully debuted.

The high voltage soft starter of sintering machine upgrading project of an iron and steel group in Gansu province was successfully debuted.

21

2024/12

Xi’an Cheegon Electric Co., Ltd. | The high voltage soft lifting of a trunk canal project in an irrigation district of Sichuan Province was successfully debugged.

The high voltage soft lifting of a trunk canal project in an irrigation district of Sichuan Province was successfully debugged.

21

2024/12